
Belgium: HGV traffic redirected to the main roads starting from November
From Monday, November 4, the local authorities of Steenokkerzeel, Kampenhout, Kortenberg and Herent introduce a route coordination scheme for HGV traffic (tonnage limitation, maximum permissible weight of 3.5 tons) at inter-municipal level.
GHV through traffic will have to use the main roads – Haachtsesteenweg (N21), Tervuursesteenweg (N227), Brusselsesteenweg (N2) and Leuvense-/Mechelsesteenweg (N26). This restriction only applies to freight vehicles in through traffic. Local freight traffic (e.g. deliveries) is permitted even if the GVW exceeds the limit of 3.5 tons.
Latest Posts
Cancelled sailings to Sweden – Unity Line switches to truck check-in without reservations
Unity Line has announced further cancellations of scheduled ferry sailings between Świnoujście and ports in Sweden (Trelleborg, Ystad) due to difficult...
Night closures of the Mont Blanc Tunnel. Disruptions on the France–Italy corridor
The Mont Blanc Tunnel operator has scheduled maintenance works for March and April 2026, which will result in night-time traffic disruptions. The...
The Netherlands closes a tunnel on the route to Belgium
The Dutch infrastructure authority has scheduled a series of night closures of the Drechttunnel on the A16 motorway in 2026. The restrictions, related to...